Activated Carbon Change Out

Key Project Details

PROJECT INDUSTRY

Oil and Gas

LOCATION

Port Moresby, Central Province, Papua New Guinea

TWM GROUP DIVISIONS

Total Industrial Services

KEY DELIVERABLES

2 Carbon Filter bed change outs over 2 stages requiring high risk inert entry CSE works. Waste treatment& disposal.

QHSSE OUTCOMES

Zero LTIs

TWM GROUP RESOURCES

Project Management, Mobile Plant & Operators, HS&E & Reporting

Key Project Details

PROJECT INDUSTRY
Oil and Gas
LOCATION
Port Moresby, Central Province, Papua New Guinea
TWM GROUP DIVISIONS

Total Industrial Services

KEY DELIVERABLES

2 Carbon Filter bed change outs over 2 stages requiring high risk inert entry CSE works. Waste treatment& disposal.

QHSSE OUTCOMES

Zero LTIs

TWM GROUP RESOURCES

Project Management, Mobile Plant & Operators, HS&E & Reporting

Project Overview

Total Industrial Services successfully completed two Activated Carbon Filter bed change outs in Papua New Guinea over 2 phases. As head contractor, TWM provided overall project management, shipping & logistics support, Permits, Waste treatment and disposal, manpower and local knowledge.
The Activated Carbon beds contained 10.2t/bed of Activated Carbon Media and the project required media removal, quarantine and disposal.

Total Industrial Services, part of TWM Group, is the only company in PNG to have applied for and obtained a transboundary waste permit for activated carbon disposal.

Scope of Work

The Activated Carbon Filter media change out project utilized vacuum extraction equipment for media extraction and transfer into 1m3 Bulka bags.
The teams were credited by the client for their professionalism and safety focus throughout the Carbon filter bed change out executions.
The project was delivered on time with zero LTI’s.
The equipment utilized on the project is a specific design configured to reduce mechanical/ human interface risks. The client singling out the drum decanter for its safe design (this enables both removal of spent carbon and direct loading into bags for transport to destruction).
The (CSE) system utilizing primary/secondary breathing systems due to its umbilical design was also singled out for its safety design and process.

Divisions

Certifications

Location

Discover More

Find out more about our profiled projects delivered in PNG and across the region.

Got a question or need a project scoped?

Get in touch

Please contact our Friendly Team to discuss your project or upcoming needs.