Landfill construction earthworks
Key Project Details
Project Industry
Waste Management Support services
Location
Port Moresby, Central Province, Papua New Guinea
TWM Group Divisions
Construction
Key Deliverables
World standard Hazards Landfill meeting (US and Victorian EPA standards
QHSSE Outcomes
Zero LTIs
TWM Group Resources
Project Management, Mobile Plant & Operators, Site Personnel, HS&E & CQA
Key Project Details
Construction
World standard Hazards Landfill meeting (US and Victorian EPA standards
Zero LTIs
Project Management, Mobile Plant & Operators, Site Personnel, HS&E & CQA
Project Overview
The landfill development is part of TWM’s Integrated Waste Management Facility. It is designed to protect the environment from contaminants which may be present in the waste stream.
Phase 1: Construction of a landfill cell & leachate pond. The completed attenuation layers passed at inspection followed by laying of liner.
Scope of Work
Mobilization & demobilization, initial site survey & establish set out points
Prepare & manage stockpiles
Bulk cut to design levels, including loading and haulage of stockpile area
Rip & treat to 200mm depth, existing subgrade material to landfill cell
Rip & treat to 200mm depth, existing subgrade to leachate cell.
Supply and construct 300mm attenuation layer on base & slopes of the Stage 1 landfill cell.
Excavate, backfill & compact anchor trenches
Construct engineered fill surrounding side riser secondar leachate extraction pipe works
Divisions
- Construction
Certifications
Location
Discover More
Find out more about our profiled projects delivered in PNG and across the region.
- All
- Total Environmental Advisory Services
- Total Industrial Services
- Total Renewables
- Total Training Services
- Total Waste Management
Got a question or need a project scoped?